Almatinskiy

English

The “Almatinskiye Interregional Transmission Networks” Branch of KEGOC has been set up in September 1997. 

Director is Kairat Karakesekov.

The main objectives of the Branch are:

 

  • To transmit electric energy and capacity through electricity networks from substations and power plants busses in the volumes and conditions set by the NDC of the Kazakhstani SPG.
  • To form the most reliable and profitable pattern of electricity networks.

The property of the branch includes overhead transmission lines in overhead clearance 0.4 – 500 kV with total length 3548.882 km (circuits), and also 11 substations 35 – 500 kV, with total capacity of 4229.35 MVA

The staff numbers 437 employees.