The “Sarbaiskiye Interregional Transmission Networks” Branch of KEGOC has been set up in August 1997.

Director - Aleksandr Daineko.

The main objectives of the Branch are:

  • To transmit electric energy and capacity through electricity networks from substations and power plants busses in the volumes and conditions set by the NDC of the Kazakhstani SPG.

  • To form the most reliable and profitable pattern of electricity networks.

The property of the branch includes overhead transmission lines in overhead clearance 6 – 1150 kV with total length 2443.525 km (circuits), and also 8 substations 220 – 1150 kV, with total capacity of 6819.9 MVA. 

 

The staff numbers 470 employees.